Arrangement of material depots for line segment– modeled structures using continuous conditions

Author(s):

Medium: journal article
Language(s): English
Published in: Organization, Technology and Management in Construction, , n. 1, v. 8
Page(s): 1518-1527
DOI: 10.1515/otmcj-2016-0009
Abstract:

In this study, we introduce a model for optimizing the arrangement of final material depots at a construction site. The target is to minimize the construction time, cost and resources by minimizing the total delivery distance. The model simplifies the structures that shall be constructed as line segments or curves. The model uses continuous conditions: the feasible positions of the final material depots are searched on the entire XY plane and the structures are used in a continuous way also. A simple example demonstrates the algorithm, and the calculated result is compared with an expert’s solution. The practicability of the model is discussed by comparing the result of the model with the output of the mentality of the laborers. The further generalization of the model is declared. It needs less input data than the discrete model does so that it can be an alternative model to the discrete model if the number of units that build up the structure is large or unknown. This article is an extended version of a conference paper (Pém and Mályusz 2016).

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/otmcj-2016-0009.
  • About this
    data sheet
  • Reference-ID
    10411612
  • Published on:
    12/02/2020
  • Last updated on:
    24/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine