Architecture and Planning Design Strategy of Post-disaster Temporary Settlement with High Building Density——Analysis Based on the Questionnaire in Dujiangyan after Wenchuan Earthquake
Author(s): |
Luhong Huang
Enshen Long |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Procedia Engineering, 2015, v. 121 |
Page(s): | 101-106 |
DOI: | 10.1016/j.proeng.2015.08.1028 |
- About this
data sheet - Reference-ID
10669900 - Published on:
18/06/2022 - Last updated on:
18/06/2022