0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Arch First and Beam Later Technology: An Accelerated and Safe Construction for Tied Arch Bridges

Author(s): ORCID (Department of Civil and Transportation Engineering, Hohai Univ., Nanjing, People’s Republic of China)
ORCID (Department of Civil and Transportation Engineering, Hohai Univ., Nanjing, People’s Republic of China)
ORCID (Department of Civil and Transportation Engineering, Hohai Univ., Nanjing, People’s Republic of China)
ORCID (Department of Civil and Transportation Engineering, Hohai Univ., Nanjing, People’s Republic of China)
Medium: journal article
Language(s): English
Published in: Structural Engineering International
Page(s): 1-9
DOI: 10.1080/10168664.2024.2312179
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/10168664.2024.2312179.
  • About this
    data sheet
  • Reference-ID
    10768821
  • Published on:
    29/04/2024
  • Last updated on:
    29/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine