0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001356.
  • About this
    data sheet
  • Reference-ID
    10171100
  • Published on:
    02/12/2018
  • Last updated on:
    02/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine