Applying rough random MODM model to resource-constrained project scheduling problem: A case study of Pubugou Hydropower Project in China
Author(s): |
Zhe Zhang
Jiuping Xu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | KSCE Journal of Civil Engineering, May 2014, n. 5, v. 18 |
Page(s): | 1279-1291 |
DOI: | 10.1007/s12205-014-0426-1 |
- About this
data sheet - Reference-ID
10172242 - Published on:
11/12/2018 - Last updated on:
11/12/2018