0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Applying Optimal Control Model to Dynamic Equipment Allocation Problem: Case Study of Concrete-Faced Rockfill Dam Construction Project

This publication has been cited in the following 7 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10235821
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine