0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Applying Earned Value to Construction Projects

This publication lists 9 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10432601
  • Published on:
    25/08/2020
  • Last updated on:
    14/09/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine