Application of built-in microphone of smartphone for inspecting unbonded length of fully grouted rock bolt
Author(s): |
Jong-Sub Lee
Jung-Doung Yu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, April 2024, v. 146 |
Page(s): | 105646 |
DOI: | 10.1016/j.tust.2024.105646 |
- About this
data sheet - Reference-ID
10770372 - Published on:
29/04/2024 - Last updated on:
29/04/2024