0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Applicability of MEP and SEMEP for computing total sediment load (Case Study: Chelichay Catchment in Golestan Province)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-014-1454-6.
  • About this
    data sheet
  • Reference-ID
    10172445
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine