0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Appellate Court Reverses Judgment Based on Clear Intent of Change Orders and Claims

Author(s): (Student, Dept. of Civil and Environmental Engineering, Univ. of Hawaii at Manoa, Honolulu, HI 96822.)
(Prof., Dept. of Civil and Environmental Engineering, Univ. of Hawaii at Manoa, Honolulu, HI 96822.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 2
Page(s): 128-131
DOI: 10.1061/(asce)la.1943-4170.0000030
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000030.
  • About this
    data sheet
  • Reference-ID
    10579637
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine