Anchorage of external reinforcement in the case of rigid clamping
Author(s): |
Guoqing Luo
Martin Mensinger |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Steel Construction, June 2016, n. 2, v. 9 |
Page(s): | 122-131 |
DOI: | 10.1002/stco.201610017 |
Abstract: |
In the case of frame bridges with external reinforcement, the reinforcing elements have to be anchored in the abutment wall. Owing to the interaction of negative bending moment and longitudinal shear force in the abutment area, the force transfer between concrete, external steel reinforcement and normal steel reinforcement is complex. Two frame structure tests were carried out to investigate the loadbearing behaviour and rational anchorage length of external reinforcement in abutments. Two different anchorage lengths were tested, and the structural behaviour and failure modes of the two specimens were compared and analysed. The results indicate that the anchorage length has a great influence on the loadbearing capacity, and the pull-out effect at the end of the external reinforcement should be paid special attention. The detail stress distribution and the M-V interaction in the anchored external reinforcement were obtained from the tests and the results fit well with the theoretical calculation. Mechanical models are proposed to evaluate the pull-out effect and optimize the anchorage length of the external reinforcement. |
Keywords: |
external reinforcement frame structures composite dowels pull-out effect
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10073151 - Published on:
27/06/2016 - Last updated on:
27/06/2016