0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10176539
  • Published on:
    30/11/2018
  • Last updated on:
    02/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine