0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Analysis on the behavior of shield TBM cable tunnel: The effect of the distance of backfill grout injection from the end of skin plate

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.9711/ktaj.2013.16.2.213.
  • About this
    data sheet
  • Reference-ID
    10394680
  • Published on:
    04/01/2020
  • Last updated on:
    04/01/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine