Analysis of the Variability of Project Cost and Schedule Performance in the Design-Build Environment
Author(s): |
Yunping Liang
Baabak Ashuri Wei Sun |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, June 2020, n. 6, v. 146 |
Page(s): | 04020060 |
DOI: | 10.1061/(asce)co.1943-7862.0001851 |
- About this
data sheet - Reference-ID
10420049 - Published on:
16/04/2020 - Last updated on:
16/04/2020