Analysis of Stress and Deformation and Stability of Grouting Wall and Mud Control in Tunnel Excavation
Author(s): |
Xuebin Wang
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | IOP Conference Series: Earth and Environmental Science, 1 July 2021, n. 2, v. 804 |
Page(s): | 022093 |
DOI: | 10.1088/1755-1315/804/2/022093 |
Abstract: |
To prevent the grout and fissure water from gushing out of the working face and to ensure the effective diffusion of grout along the fissure under the action of high grouting pressure, the grouting wall should be set up on the working face before grouting to ensure the grouting effect. This study found that under the grouting pressure of 4MPa, the grouting wall model with a thickness of 80cm is more stable than that with a thickness of 50cm. At the same time, for the grouting stop wall with a thickness of 80cm and a dip angle of 50°, both the horizontal deformation and the settlement of the vault have met the requirements of the construction specification in the process of simulated grouting calculation. |
License: | This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.82 MB
- About this
data sheet - Reference-ID
10781072 - Published on:
11/05/2024 - Last updated on:
05/06/2024