0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Analysis of safety cost structure in infrastructure project of precast of precast concrete bridge based on Work Breakdown Structure (WBS)

This publication lists 13 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10675222
  • Published on:
    28/05/2022
  • Last updated on:
    28/05/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine