Analysis of normal operation of a rockfill dam with combination of seepage-control elements: reinforced concrete face and clay-cement-concrete wall
Author(s): |
M. P. Sainov
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Magazine of Civil Engineering / Инженерно-строительный журнал, November 2016, n. 4, v. 64 |
Page(s): | 3-9 |
DOI: | 10.5862/mce.64.1 |
Structure Types
- About this
data sheet - Reference-ID
10263772 - Published on:
14/02/2019 - Last updated on:
14/02/2019