Analysis of Construction Duration and Cost for Public Sector Civil Engineering Projects in Libya
Author(s): |
Tgarid Ali
Xiaohui Zhong Utpal Dutta |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Civil Engineering and Architecture, December 2018, n. 12, v. 12 |
DOI: | 10.17265/1934-7359/2018.12.002 |
Geographic Locations
- About this
data sheet - Reference-ID
10590977 - Published on:
15/03/2021 - Last updated on:
15/03/2021