Analysis and Research on Blasting Network Delay of Deep-Buried Diversion Tunnel Crossing Fault Zone Based on EP-CEEMDAN-INHT
Author(s): |
Jing Wu
Li Wu Miao Sun Ya-ni Lu Yan-hua Han |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geotechnical and Geological Engineering, 23 September 2021, n. 3, v. 40 |
Page(s): | 1363-1372 |
DOI: | 10.1007/s10706-021-01968-9 |
- About this
data sheet - Reference-ID
10673828 - Published on:
12/06/2022 - Last updated on:
12/06/2022