Eine Analyse von Zyklischen Systemen unter Unbestimmtheitsbedingungen
Author(s): |
O. Kapliński
|
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, March 1995, n. 1, v. 1 |
Page(s): | 93-101 |
DOI: | 10.3846/13921525.1995.10531505 |
Abstract: |
This paper presents the problem of balancing specific construction processes with cyclic configuration. The processes of assembly of forming equipment in a monolithic housing building are an example of the consideration. The rules decomposition and synthesis at the production system has been used. Three examples of the loss functions are given. The results of analysis have been compared by means of Laplace's and Wald's criterions. |
Copyright: | © 1995 The Author(s). Published by VGTU Press. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.48 MB
- About this
data sheet - Reference-ID
10363967 - Published on:
12/08/2019 - Last updated on:
02/06/2021