首都高速宝町オンランプ高架工事に用いた深礎ぐいと鋼製橋脚の接合方法に関する研究 (An Experimental Study on a Newly Proposed Connection Between a Steel Pier Base and a Cast-in-Place Pile with Manual Excavation for the Construction of Takaracho On-Ramp Viaduct at the Tokyo Metropolitan Expressway)
Author(s): |
K. Izumi
H. Tominaga M. Ogihara |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 1995, n. 10, v. 33 |
Page(s): | 37-47 |
DOI: | 10.3151/coj1975.33.10_37 |