0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

하도급대금 직접지급에 대한 쟁점판례 분석 - 공공 건설공사를 중심으로 - (An Analysis of Judicial Precedents for Progress Payment to Subcontractor - Focused on Public Construction Projects -)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2010.10.1.111.
  • About this
    data sheet
  • Reference-ID
    10761986
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine