An alternative technique to the demolition of a prestressed concrete box-girder bridge: A case study
Author(s): |
S. S. R. Pereira
M. D. C. Magalhaes H. Gazzinelli |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Case Studies in Construction Materials, June 2017, v. 6 |
Page(s): | 192-197 |
DOI: | 10.1016/j.cscm.2017.03.003 |
- About this
data sheet - Reference-ID
10577205 - Published on:
26/02/2021 - Last updated on:
26/02/2021