AJRM as basis for design and construction of more than 70 km of tunnels of the Railway Project Stuttgart-Ulm
Author(s): |
Walter Wittke
Martin Wittke Claus Erichsen Bettina Wittke-Schmitt Patricia Wittke-Gattermann Dieter Schmitt |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanics and Tunnelling, April 2017, n. 2, v. 10 |
Page(s): | 204-211 |
DOI: | 10.1002/geot.201600083 |
- About this
data sheet - Reference-ID
10084114 - Published on:
09/10/2018 - Last updated on:
18/10/2018