0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Aicha-Mauls on the Brenner Base Tunnel - status of the works and results / Aicha-Mauls am Brenner Basistunnel - Stand der Arbeiten und Ergebnisse

Author(s):



Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 5, v. 3
Page(s): 520-533
DOI: 10.1002/geot.201000044
Abstract:

The paper reports on the current status of work on the conventionally excavated Mauls Tunnel and the mechanically bored Aicha Tunnel and presents the results of the geological, hydrogeological and geotechnical documentation. The knowledge gained from the investigation works will have great significance for the design and the implications for the construction of the main bores of the Brenner Base Tunnel. The example of the failure in the Aicha Tunnel is used to describe the measures to find the cause and the consequences for risk management are explained.

Keywords:
measurement Mauls adit Aicha investigation tunnel geotechnical measurement equipment risk class segment
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201000044.
  • About this
    data sheet
  • Reference-ID
    10063740
  • Published on:
    19/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine