0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Adoption of the digitalised last planner system in infrastructure projects: an Australian case study

This publication lists 40 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10744749
  • Published on:
    28/10/2023
  • Last updated on:
    28/10/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine