Adjustments for Temperature, Camber, and Deflection, and Procedure for Setting out During Erection of the Steel Arch Bridge Across the Reond Nullah at Mile 59.25 on the Kangra Valley Railway, India
Author(s): |
W. E. Gelson
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Selected Engineering Papers, January 1929, n. 82, v. 1 |
DOI: | 10.1680/isenp.1929.15054 |
- About this
data sheet - Reference-ID
10264697 - Published on:
10/01/2019 - Last updated on:
10/01/2019