Adaption of construction management aspects and building economic principles to prevent cost overruns in modern timber construction
Author(s): |
J. Koppelhuber
M. W. Bok |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | IOP Conference Series: Materials Science and Engineering, May 2020, v. 800 |
Conference: | 5th International Conference on New Advances in Civil Engineering (ICNACE 2019) 8-10 November 2019, Kyrenia, Cyprus |
Page(s): | 012030 |
DOI: | 10.1088/1757-899X/800/1/012030 |
Copyright: | © 2020 J Koppelhuber, M W Bok |
License: | This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
Download full text file (PDF)
1.4 MB
Advertisement
Advertisement
1.4 MB
- About this
data sheet - Reference-ID
10433079 - Published on:
25/08/2020 - Last updated on:
14/09/2021