0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Actual State of the Works on the Mont Cenis Tunnel, and Description of the Machinery Employed

Author(s):
Medium: journal article
Language(s): English
Published in: Minutes of the Proceedings of the Institution of Civil Engineers, , n. 1864, v. 23
Page(s): 258-286, plates
DOI: 10.1680/imotp.1864.23285

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/imotp.1864.23285.
  • About this
    data sheet
  • Reference-ID
    10187513
  • Published on:
    02/01/2019
  • Last updated on:
    02/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine