0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Activity theory-based analysis of BIM implementation in building O&M and first response

Author(s):



Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 85
Page(s): 317-332
DOI: 10.1016/j.autcon.2017.10.017
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2017.10.017.
  • About this
    data sheet
  • Reference-ID
    10190965
  • Published on:
    01/12/2018
  • Last updated on:
    01/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine