0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An Active Construction Dynamic Schedule Management Model: Using the Fuzzy Earned Value Management and BP Neural Network

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10601444
  • Published on:
    17/04/2021
  • Last updated on:
    26/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine