Active BIM system for optimized multi-project ready-mix-concrete delivery
Author(s): |
Hana Begić
Mario Galić Uroš Klanšek |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-11-2022-1064 |
- About this
data sheet - Reference-ID
10738925 - Published on:
03/09/2023 - Last updated on:
03/09/2023