0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Accelerated work‐schedule design considering efficiency losses for overtime and overmanning

Author(s):
Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 5, v. 10
Page(s): 312-321
DOI: 10.1108/09699980310502928
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/09699980310502928.
  • About this
    data sheet
  • Reference-ID
    10575953
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine