Accelerated Bridge Construction of the New Samuel De Champlain Bridge
Author(s): |
Marwan Nader
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Bridge Engineering (ASCE), February 2020, n. 2, v. 25 |
Page(s): | 05019015 |
DOI: | 10.1061/(asce)be.1943-5592.0001515 |
- About this
data sheet - Reference-ID
10399850 - Published on:
11/12/2019 - Last updated on:
11/12/2019