시뮬레이션 기반의 타워크레인 설치 생산성 분석 (A Productivity Analysis of Tower Crane Installation Progress Based on Simulation Technique)
Author(s): |
Yun-Sik Kim
Jae-Kyong Cho Min-Ji Kim Kyu-Man Cho Chang-Taek Hyun |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), April 2010, n. 2, v. 10 |
Page(s): | 33-40 |
DOI: | 10.5345/jkic.2010.10.2.033 |
- About this
data sheet - Reference-ID
10761973 - Published on:
15/03/2024 - Last updated on:
15/03/2024