用于控制下覆地铁隧道隆起的一种新的基坑开挖方法 (A New Excavation Method for Controlling the Uplift of Overburden Tunnel)
Author(s): |
岳云鹏
|
---|---|
Medium: | journal article |
Language(s): | Chinese |
Published in: | Hans Journal of Civil Engineering 的中文名称是土木工程, 2019, n. 3, v. 8 |
Page(s): | 568-575 |
DOI: | 10.12677/hjce.2019.83067 |
- About this
data sheet - Reference-ID
10378340 - Published on:
12/11/2019 - Last updated on:
12/11/2019