4-Stufen-Risikosimulation zur Ermittlung von Mittelabflüssen unter Berücksichtigung des geplanten Baufortschritts

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 7, v. 89
Page(s): 463-470
DOI: 10.1002/bate.201200015
Abstract:

4-step-risk-simulation for the calculation of the cash outflow of the client with consideration to the scheduled construction process

Due to the complexity, the long duration and the needed scale of budget construction projects are high-risk-projects. The common methods can estimate a monetary value for the total risk of a construction project. Nevertheless, for the client it is important to know the date of additional cost for occurred risks to optimize his financial plan. This paper will show how the possible date of risks can be used to estimate a chronological sequence of the cash outflow.

Keywords:
risk cash outflow costs
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201200015.
  • About this
    data sheet
  • Reference-ID
    10066765
  • Published on:
    05/09/2012
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine