0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

2-arch 터널 정거장 굴착 시 평면변형률 조건에서 군말뚝의 이격거리에 따른 지반거동 분석 (Investigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.9711/ktaj.2016.18.6.535.
  • About this
    data sheet
  • Reference-ID
    10394738
  • Published on:
    26/11/2019
  • Last updated on:
    26/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine