0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

伊良部大橋上部工の施工─塩害地区における100年対応の橋梁を目指して─ (Construction Report from IRABU-BRIDGE—A Plan for Building Durable Prestressed Concrete Structures in Marine Environments—)

Author(s):


Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 11, v. 49
Page(s): 11_41-11_46
DOI: 10.3151/coj.49.11_41
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj.49.11_41.
  • About this
    data sheet
  • Reference-ID
    10438751
  • Published on:
    08/10/2020
  • Last updated on:
    08/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine