Abstract:
|
The Yavuz Sultan Selim bridge, also known as the 3rd Bosphorus Bridge, was opened to road traffic in August 2016. The stiffened suspension bridge, with a main span of 1408m, overall length 2250m and width 59.4m, is believed to be the first of its type. It is situated in a seismic region and exposed to a severe wind climate. It has been designed and constructed to carry 8 lanes of road traffic and twin track heavy rail-all on a single deck. The bridge has been equipped with a Structural Health Monitoring (SHM) system. The instrumentation allows the monitoring of bridge behaviour. The dehumidification of the towers, bridge deck and suspension cables is also monitored. The ambient weather conditions including wind velocity, humidity and seismic activity are recorded. This paper gives an overview of the inspection and maintenance regime. It also describes the observed performance of the bridge against its predicted behaviour.
|