West Gate Bridge – Conquering the Logistical Challenges

 West Gate Bridge – Conquering the Logistical Challenges
Author(s):
Presented at 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, published in , pp. 903-910
DOI: 10.2749/222137912805111249
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.26 MB

The 2.5km long West Gate Bridge comprises an eastern and western concrete approach viaduct, 871m and 670m respectively in length either side of the 848m long cable stayed steel box girder main span...
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Published in:
Page(s): 903-910 Total no. of pages: 8
Page(s): 903-910
Total no. of pages: 8
DOI: 10.2749/222137912805111249
Abstract:

The 2.5km long West Gate Bridge comprises an eastern and western concrete approach viaduct, 871m and 670m respectively in length either side of the 848m long cable stayed steel box girder main span section. The key objective with the West Gate Bridge Strengthening Project was to increase the number of lanes in each carriageway from 4 to 5 to reduce traffic congestion on the M1 Freeway.

With the bridge carrying over 170,000 vehicles per day, being a key link in the transport network around Melbourne and spanning the Yarra River, the entrance to Australia’s busiest port, the project was always going to be a logistical challenge. This paper describes these challenges and the extraordinary measures that were implemented for the work to be completed safely and economically.

Keywords:
bridges box girders strengthening rehabilitation logistics