0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time-Dependent Bending Moment Analysis for Pile-Raft Foundation of Super Tall Buildings

 Time-Dependent Bending Moment Analysis for Pile-Raft Foundation of Super Tall Buildings
Author(s): , ,
Presented at IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, published in , pp. 585-592
DOI: 10.2749/222137815818357647
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.12 MB

In the interaction process of superstructure and foundation for super tall buildings, materials, structures and loads all are time-dependent. With the substantially increasing of super tall buildin...
Read more

Bibliographic Details

Author(s): (Department of Geotechnical Engineering, Tongji University, Shanghai, China &)
(Xin Zhao)

Medium: conference paper
Language(s): English
Conference: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Published in:
Page(s): 585-592 Total no. of pages: 8
Page(s): 585-592
Total no. of pages: 8
Year: 2015
DOI: 10.2749/222137815818357647
Abstract:

In the interaction process of superstructure and foundation for super tall buildings, materials, structures and loads all are time-dependent. With the substantially increasing of super tall buildings and the rapid development of computer technology, the time-dependent interaction study also has made great progress, and this issue has received more and more attention in the engineering filed. By considering the time-dependent features of settlement and superstructure, the interaction of super tall buildings and foundation is analyzed through using time-slicing approach in this paper. Comprehensively taking into account the coupling effects of time- dependent actions, this paper discussed the time-dependent effect for raft bending moment considering construction process in super tall buildings. The analysis results show that the bending moment differences in super tall buildings raft caused by the time-dependent effect are within permissible range of engineering practice. That is to say, the traditional lumped analysis method can be able to meet the calculation accuracy requirements of the raft bending moment.

Keywords:
super tall buildings time-dependent settlement construction sequences time-dependent interaction raft bending moment