0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Temburong Bridge, Brunei – Design of CC1 Tunnels and Bridges in Mentiri

 Temburong Bridge, Brunei – Design of CC1 Tunnels and Bridges in Mentiri
Author(s): , , , ,
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 2315-2322
DOI: 10.2749/stockholm.2016.2306
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.22 MB

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. The p...
Read more

Bibliographic Details

Author(s): (Arup, Hong Kong)
(Arup, Hong Kong)
(Arup, Hong Kong)
(Ove Arup dan Rakan Rakan, Brunei Darussalam)
(Arup, Hong Kong)
(Arup, Hong Kong)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2315-2322 Total no. of pages: 8
Page(s): 2315-2322
Total no. of pages: 8
Year: 2016
DOI: 10.2749/stockholm.2016.2306
Abstract:

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. The project includes approximately 3.6 km in Brunei-Muara district where the new road will pass through the Mentiri hills. This section will be built under Construction Contract CC1 and includes 3 twin-bore lengths of tunnel and various bridge structures. Design is to Eurocode.

The tunnels are in hard soils / weak rock and will be the first mined tunnels to be built in Brunei. The tunnel portals incorporate Islamic shapes to continue the architectural theme of the project.

Bridges will link the different tunnels together and form the free-flow connections to an existing dual carriageway at the north-west end of the scheme.

Keywords:
box girder bridge Eurocodes Brunei bored tunnels twin ribbed deck bridge

Structures and Projects