0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Sydney Metro Cable Stayed Bridge, a Meeting of Precast Segmental Concrete and Cable Stayed Construction Technology

 Sydney Metro Cable Stayed Bridge, a Meeting of Precast Segmental Concrete and Cable Stayed Construction Technology
Author(s): , ,
Presented at IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, published in , pp. S16-25
DOI: 10.2749/nantes.2018.s16-25
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.28 MB

Sydney Metro’s expansion into the north west of the city has recently included the construction of

4.5 km of elevated viaduct that includes a one of kind cable rail bridge. Set out on a 403 m...
Read more

Bibliographic Details

Author(s): (SMEC South Africa, Cape Town, South Africa)
(SMEC, Sydney, Australia)
(SMEC, Sydney, Australia)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Published in:
Page(s): S16-25 Total no. of pages: 8
Page(s): S16-25
Total no. of pages: 8
DOI: 10.2749/nantes.2018.s16-25
Abstract:

Sydney Metro’s expansion into the north west of the city has recently included the construction of

4.5 km of elevated viaduct that includes a one of kind cable rail bridge. Set out on a 403 m horizontal radius with a 130 m long main span, the bridge’s prestressed precast concrete segmental deck is supported by a single plane of cables. An integral part of the design challenge was the need to construct the bridge using the same overhead gantry used to construct the simply support spans on the main viaduct. Using the gantry, the three span structure was first built as a continuous girder supported on the four permanent supports with five temporary supports. The deck sections were erected as a series of cantilevers, then connected into a continuous girder and finally, after the release of the temporary supports, converted into a cable supported structure. A feature of the design was the staging of the deck prestressing that avoided removing strand installed during a previous stage as the bridge metamorphized from a seven-span structure to a three-span structure.

Keywords:
rail cable-stayed curved erection engineering temporary works precast segmental