0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A study on the depth-tunnel mechanized excavation and optimum cross-section in GTX (Great Train eXpress) tunnel

A study on the depth-tunnel mechanized excavation and optimum cross-section in GTX (Great Train eXpress) tunnel
Author(s): ,
Presented at 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, published in , pp. 1912-1919
DOI: 10.2749/222137912805112563
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.19 MB

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Published in:
Page(s): 1912-1919 Total no. of pages: 8
Page(s): 1912-1919
Total no. of pages: 8
DOI: 10.2749/222137912805112563

Structure Types