0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Study and Application on Girder-Conveying By Track Cable Method for Stiffening Girder of Long-Span Suspension Bridge

The Study and Application on Girder-Conveying By Track Cable Method for Stiffening Girder of Long-Span Suspension Bridge
Author(s): , , ,
Presented at 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, published in , pp. 310-317
DOI: 10.2749/222137912805110556
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.14 MB

This paper introduces a new construction method for the longitudinal transportation of stiffening girder of long-span suspension bridge, which is called girder-conveying by track cable method, <...
Read more

Bibliographic Details

Author(s):



Medium: conference paper
Language(s): English
Conference: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Published in:
Page(s): 310-317 Total no. of pages: 8
Page(s): 310-317
Total no. of pages: 8
DOI: 10.2749/222137912805110556
Abstract:

This paper introduces a new construction method for the longitudinal transportation of stiffening girder of long-span suspension bridge, which is called girder-conveying by track cable method, and it is an original erection method for stiffening girder of suspension bridges. The method is applied to carry the stiffening girder longitudinally by girder carrier through traction over a flexible tensile track cable, which serves as a load carrying member suspended under the main cable and connected with suspenders. This new method overcomes the difficulties of traditional method in longitudinal transportation of stiffening girder, hoisting load constraint and poor economical efficiency for long-span suspension bridge construction in mountainous areas. By adopting this new method, the large stiffening girder sections can be conveyed and erected under various orographic condition. The method has been adopted in the construction of Aizhai Bridge in Hunan Province, China.

Keywords:
suspension bridge stiffening girder track cable girder-conveying by track cable method girder carrier

Structure Types