0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Static and Dynamic Analysis of the Railway Bridge on the Line Devínska Nová Ves - Štúrovo (The Red Bridge) at km 51.368

 Static and Dynamic Analysis of the Railway Bridge on the Line Devínska Nová Ves - Štúrovo (The Red Bridge) at km 51.368
Author(s): ,
Presented at IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, published in , pp. 168-169
DOI: 10.2749/222137813806474705
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.25 MB

Toward the end of 2011 a static and dynamic analysis of the railway bridge situated at km 51.368 of the line Devínska Nová Ves – Štúrovo have been carried out. Calculations were performed to assess...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Published in:
Page(s): 168-169 Total no. of pages: 6
Page(s): 168-169
Total no. of pages: 6
Year: 2013
DOI: 10.2749/222137813806474705
Abstract:

Toward the end of 2011 a static and dynamic analysis of the railway bridge situated at km 51.368 of the line Devínska Nová Ves – Štúrovo have been carried out. Calculations were performed to assess the bridge carrying capacity with regard to the load imposed to it by rail traffic and to analyse the effects of various burden types on its stress state, particularly on its rail deck and its main beams. The dynamic analysis investigated the effects of service load at various speeds to determine critical points of the structure. The evaluated stress range spectra resulting from a train passage have served to determine the residual life of the Red Bridge structure.

Keywords:
steel bridge load carrying capacity Dynamic effects/vibrations Assessment/ Repair