SHM of the new bridge over the River Sado in Portugal during construction

 SHM of the new bridge over the River Sado in Portugal during construction
Author(s): , ,
Presented at IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, published in , pp. 1-8
DOI: 10.2749/222137813808627118
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.27 MB

The new railway crossing over the River Sado is a 2,7 km long bridge, including two approach viaducts and a main bridge. The main bridge, with a continuous deck over 480 m, consists of three contin...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Published in:
Page(s): 1-8 Total no. of pages: 8
Page(s): 1-8
Total no. of pages: 8
Year: 2013
DOI: 10.2749/222137813808627118
Abstract:

The new railway crossing over the River Sado is a 2,7 km long bridge, including two approach viaducts and a main bridge. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a single plane of hangers on the bridge axis. The bridge is located in an environmentally sensitive area which conditioned the design and the construction methods used.

The bridge importance, its structural complexity and the innovative constructions methods used were the main constraints and motivations for the development of the implemented structural monitoring system, which is described herein. The motivation of this paper is to present the structural monitoring system and the experimental bridge behaviour during the deck incremental launching and the hoisting of the arches.

Keywords:
incremental launching bridge construction structural health monitoring bowstring arch bridge