0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

ShiZiYang Bridge – General Scheme Design Options for Mega Suspension Bridge

 ShiZiYang Bridge – General Scheme Design Options for Mega Suspension Bridge
Author(s): , , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 135-144
DOI: 10.2749/nanjing.2022.0135
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.18 MB

The ShiZiYang suspension bridge in the Guangdong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the double-deck tr...
Read more

Bibliographic Details

Author(s): (College of Civil Engineering, Tongji University, Shanghai, China)
(Deputy Chief Engineer, Guangdong Provincial Communication Group Company Limited, China)
(Chief Engineer, Guangdong Bay Area Transportation Construction Investment Co. Ltd., China)
(Associate Project Director, COWI A/S, Denmark)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 135-144 Total no. of pages: 10
Page(s): 135-144
Total no. of pages: 10
DOI: 10.2749/nanjing.2022.0135
Abstract:

The ShiZiYang suspension bridge in the Guangdong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the double-deck truss girder. A bridge of this previously unmatched proportion requires innovative design concepts to develop a feasible and constructable bridge. The ShiZiYang Crossing owner organization invited three well-known bridge design companies in the initial design process to develop different options for overall configuration of girder, tower, anchorage, and cable system. Each of the different concepts have their own merits and regardless which one is chosen it will be on the limit to what has previously been achieved. While focusing on minimizing the deck weight, many other items must be taken into consideration such as aerodynamic stability, operation and maintenance, construction, cost, and aesthetic value. Comprehensive comparison of various options was thus carried out to select promising options that can serve as the basis for work of the next phase.

Keywords:
suspension bridge truss girder double deck ShiZiYang general scheme design
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Structures and Projects