0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Research on the Layout of Temporary Piers of Large-span and Super- Width Steel Box Girder during Incremental Launching Construction

 Research on the Layout of Temporary Piers of Large-span and Super- Width Steel Box Girder during Incremental Launching Construction
Author(s): , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 1449-1456
DOI: 10.2749/nanjing.2022.1449
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

It is difficult to understand the mechanical performance of large-span and super-width steel box girder during the incremental launching construction, and it varies with the number of temporary pie...
Read more

Bibliographic Details

Author(s): (Tongji University, Shanghai, China)
(Tongji University,Shanghai, China)
(CCCC Quanzhou Expressway Co., Ltd., Quanzhou, China)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 1449-1456 Total no. of pages: 8
Page(s): 1449-1456
Total no. of pages: 8
DOI: 10.2749/nanjing.2022.1449
Abstract:

It is difficult to understand the mechanical performance of large-span and super-width steel box girder during the incremental launching construction, and it varies with the number of temporary piers. Combined with the engineering example of Qilu Yellow River Bridge in Jinan, this paper conducts research on the layout of temporary piers. Firstly, stress envelope of main girder and maximum support reaction forces under different layout schemes are analyzed with the frame model. Then, the local plate-shell model is used to obtain stress distribution of main plates and local stability of main girder segment under the most unfavorable loading conditions. The results show that local mechanical performance of steel box girder plays a crucial role in ensuring its safety during the incremental launching construction. Besides, rational spacing between temporary piers is 70m for Qilu Yellow River Bridge.

Keywords:
finite element analysis FEA bridge engineering steel box girder incremental launching construction layout of temporary piers
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.